You are not logged in. Click here to log in.
better threshold in inventory control
HISA-TRANSIMS can run without disruptions
change the method to find nearest facility, and intermediate state befroe generate supplementary trips
Version 0.2.11 Recovery works
add recover facility
0.2.10 Test for Repair
Correct the time in the Urban System Post Transims Process
try to avoid NullPointerException in routing plan
Start time and period conversion
HISA-TRANSIMS beta version ofr multiple simulation run
Correct the error in Aggrevated results, and change the walking distance threshold
Repair propogation, reroute unfished trips, ready to write serializable file
fix: Liu Yining HISA development
ref: Gradle folder structure